3
4 Instructions for the Installer
This chapter describes how you have to install the
4.1Preconditions for Installation
In order to be able to assess whether the ComfoAir 350canbeinstalledinaparticularroom,pleasepay attention to the following points:
•The
•The installation location must be selected such that there is sufficient space around the MTD- ERV 350 for air connections and for carrying out maintenance work.
•The following installations must be present in the room:
-Air duct connections.
-230 V power supply with fused wall plug socket.
-Installations for condensation drainage.
•Roof openings must be air and
•The exhaust air duct must have a double- walled or insulated roof opening.This prevents the formation of condensation between the layers of the roof.The exhaust air duct must be laid with a gradient towards the
•The
•The
•We recommend that silencers are installed on both the air intake and air discharge sides of the
In order to ensure a good and
4.2Installation of the MTD-ERV 350
4.2.1Transport and Unpacking
•Work carefully when transporting and unpack- ing the
Ensure that the packaging materials are disposed of in an environmentally favourable manner.
4.2.2 Checking the Scope of Supply
Should you discover any damage or missing parts of the supply product, please contact your supplier without delay. The scope of supply includes:
•
•Check the identification plate to see whether it is the correct type.
•4 x 45° connection elbows.
•Mounting brackets.
•Operating Manual.
The
Type
Type
Meaning of the suffixes:
•L = Left.
•R = Right.
• VV = Preheater.
•Luxe = Refers to the extended version of
the PCB panel.
• CC = ComfoControl Avignon. This is the touch screen remote control with ad- ditional operating options compared with the CC Ease operating unit.
26 Function of the System