MTD ERV 365, ERV 350 manual Filter Cleaning, if Preheater is Fitted, Instructions for the Installer

Models: ERV 350 ERV 365

1 56
Download 56 pages 39.4 Kb
Page 40
Image 40
4.6.2 Filter Cleaning, if Preheater is Fitted

4

K

J

I

L

36 Instructions for the InstallerN

O

M

Manual background Use a soft brush to clean the fan blades.

Manual background Remove dust using a vacuum cleaner.

Caution!

Take care not to damage the fan blades.

Caution!

Take care not to damage the tempera- ture sensor.

Install all the parts again in the reverse or- der.

Carryouttheself-testdescribedunderP76,see section 4.4.

Manual background Install the drain plate (G) again correctly under the heat exchanger. The holes in the drain plate must be on the side of the condensation drain.

Tighten the screws to a maximum torque of 1.5 Nm. This corresponds to roughly level 2 of a normal screw drill.

4.6.2 Filter Cleaning, if Preheater is Fitted

The filter of the preheater (if installed) must be cleaned every 4 years.

Remove the mains plug (A) from the plug sock- et.

Pull the filters (B) out of the MTD-ERV 350.

Remove the front plate by removing the screws

Push the front plate in the direction of the ar- row and remove it from the MTD-ERV 350.

Remove the sealing plate by removing the screws (D).

Remove the plastic plate (I) in front of the PCB panel by loosening the two screws.

Loosen the connectors (J) and the earth cable

(J)atthePCBpanelandremove thecableswith the two grommets (K) completely.

Remove the cable (P) of the PCB panel.

Remove the bottom (Q) of the preheater.

The bottom is secured in the electronic carriage by 4 tabs. Two tabs are located on the front side (visible) and two on the rear side (not visible).

Clean the filter using a brush.

Remove any caked soiling with a damp cloth.

Install all the parts again in the reverse order.

Carryouttheself-testdescribedunderP76,see section 4.4.

Manual background Install the drain plate (G) again correctly under the heat exchanger. The holes in the drain plate must be on the side of the condensation drain.

Tighten the screws to a maximum torque of 1.5 Nm. This corresponds to roughly level 2 of a normal screw drill.

36 Instructions for the Installer

Page 40
Image 40
MTD ERV 365, ERV 350 manual Filter Cleaning, if Preheater is Fitted, Instructions for the Installer