20
4.0 INSTALLATION
!WARNING
FOR SAFE AND PROPER OPERATION OF THE APPLIANCE, FOLLOW THE VENTING INSTRUCTIONS
EXACTLY.
ALL INNER EXHAUST AND OUTER INTAKE VENT PIPE JOINTS MAY BE SEALED USING EITHER RED RTV HIGH TEMP SILICONE SEALANT
IF USING PIPE CLAMPS TO CONNECT VENT COMPONENTS, 3 SCREWS MUST ALSO BE USED TO
ENSURE THE CONNECTION CANNOT SLIP OFF.
DO NOT CLAMP THE FLEXIBLE VENT PIPE.
RISK OF FIRE, EXPLOSION OR ASPHYXIATION. IMPROPER SUPPORT OF THE ENTIRE VENTING SYSTEM MAY ALLOW VENT TO SAG AND SEPARATE. USE VENT RUN SUPPORTS AND CONNECT VENT SECTIONS PER INSTALLATION INSTRUCTIONS.
RISK OF FIRE, DO NOT ALLOW LOOSE MATERIALS OR INSULATION TO TOUCH THE VENT PIPE.
REMOVE INSULATION TO ALLOW FOR THE INSTALLATION OF THE ATTIC SHIELD AND TO
MAINTAIN CLEARANCES TO COMBUSTIBLES.
68.2A
4.1MINIMUM CLEARANCES TO COMBUSTIBLES
Back Wall
E B
A
D
Side Wall
Back Wall |
|
| Back Wall |
B |
| Side | 45° |
A | A | C | |
|
| Wall | |
|
| F | |
Alcove |
|
|
Side Wall
A | 7" |
| D | 14 3/4" |
B | 2" |
| E | 4" |
C | 1"* |
| F | 9 1/2" |
-No additional floor protection is required.
-A minimum 20" from stove top to ceiling
*At a distance of 1" from the wall, access to the blower switch, on/off switch or the blower power cord may not be practical.