21
4.2WALL AND CEILING PROTECTION
!WARNING
DO NOT FILL THE SPACE BETWEEN THE VENT PIPE AND ENCLOSURE WITH ANY TYPE OF MATERIAL. DO NOT PACK INSULATION OR COMBUSTIBLES BETWEEN CEILING FIRESTOPS. ALWAYS MAINTAIN SPECIFIED CLEARANCES AROUND VENTING AND FIRESTOP SYSTEMS. INSTALL WALL SHIELDS AND FIRESTOPS AS SPECIFIED. FAILURE TO KEEP INSULATION OR OTHER MATERIALS AWAY FROM VENT PIPE MAY CAUSE FIRE.
70.1
For optimum performance, it is recommended that all horizontal runs have a minimum 1/4" rise per foot when venting. For safe and proper operation of the appliance, follow the venting instructions exactly.
4.2.1 HORIZONTAL INSTALLATION
!WARNING
THE FIRESTOP ASSEMBLY MUST BE INSTALLED WITH THE VENT SHIELD TO THE TOP.
TERMINALS MUST NOT BE RECESSED INTO A WALL OR SIDING MORE THAN THE DEPTH OF THE
RETURN FLANGE OF THE MOUNTING PLATE.
This application occurs when venting through an exterior wall. Having determined the correct height for the air terminal
location, cut and frame a hole in the exterior wall as | VENT |
illustrated to accommodate the firestop assembly. | SHIELD |
Dry fit the firestop assembly before proceeding to |
|
ensure the brackets on the rear surface fit to the |
|
inside surface of the horizontal framing. | FIRESTOP |
| |
The length of the vent shield may be cut shorter | SPACER |
for combustible walls that are less than 8 1/2” thick |
|
but the vent shield must extend the full depth of the |
|
combustible wall. |
|
A.Assemble the shield to the spacer as shown, using the 3 shorter screws supplied.
B. Place the firestop top so that the vent shield covers the top of the vent within the opening. Ensure that both spacer and shield maintain the required clearance to combustibles.
CAULKING
FINISHING MATERIAL
DETERMINE THE CORRECT HEIGHT
C.Secure the spacer in place using the 4 longer screws supplied. Once the vent pipe is installed in its final position, apply sealant between the pipe and the firestop spacer.
20.5A