NEC N8191-09 manual ① and ②

Models: N8191-09

1 104
Download 104 pages 33.91 Kb
Page 82
Image 82

1.Connect the seven servers to the ports 1 through 7 of the master side according to the procedures in "Connecting Eight or Less Servers" described earlier. (Connect in order of

and .)

AC cords for the server switch unit, the servers, and the console must be connected later.

2.Connect the connector on the port 8 of the master side to the KB, Mouse, and CONSOLE connectors on the console port of the slave unit with dedicated cable (K410-119(1A)). Connect the slave side first. (Connect in order of and .)

3.Connect the eight servers to the slave side according to the procedures in "Connecting Eight or Less Servers" described earlier. (Connect in order of and .)

Tips

Notice

If you want to add more slave units, repeat steps 1 through 3 described above. Use the port 7, 6, 5, ..., 1 of the master unit in order when adding the slave unit.

The server switch unit of the slave side cannot connect with another (the third) slave unit.

4.After completing the connection of the server switch unit with servers, connect the keyboard, mouse, and display unit to the KB, MOUSE, and CONSOLE connectors on the master unit. (Connect in the figure above.)

5.At last, connect the power cords of the servers and the display unit and the AC cord of the server switch unit to AC outlets. (Connect in the figure above.)

6.Fix the dedicated cables and AC cords with the attached tie wraps.

7.After confirming that all the connections are valid, start the servers sequentially.

8.Select each of the servers to check that it is started normally and set correctly.

If the keyboard, mouse, and/or display monitor are not set correctly, set and start each device again.

- 53 -

Page 82
Image 82
NEC N8191-09 manual ① and ②