Manuals
/
Nordyne
/
Household Appliance
/
Furnace
Nordyne
RL 90+, RC 92+
installation instructions
Models:
RC 92+
RL 90+
1
2
40
40
Download
40 pages
28.41 Kb
1
2
3
4
5
6
7
8
Specifications
Install
Electrical Wiring
Dimension
Maintenance
Start-Up Procedure
Safety
Solution
Heating Mode
Page 2
Image 2
2
Page 1
Page 3
Page 2
Image 2
Page 1
Page 3
Contents
Installation Instructions
What to do if YOU Smell GAS
Page
Table of Contents
Furnace Specifications
Downflow *RL Furnace
Capacities -Furnace Airflow Data
G6RC Upflow Furnace
Capacities
Important Note
Safety Information
Installation Requirements Requirements and Codes
Clearances to Combustible Materials
Minimum Clearances to Combustible Material
Location
Horizontal Installations
Downflow Warning *RL Models
Vinyl Cap Grey Tubing
Installation on a combustible floor *RL
Supplyair Plenum Installation
Installation on a concrete slab *RL
Circulating AIR Supply
Return Air
Venting and Combustion AIR Requirements
Downflow Sub-Base Dimensions
Furnace on a Wood Floor
Equipment in a Confined
Installation In a Confined Space
Air Requirements For One-Pipe Installation
Installation In An Unconfined Space
Combustion Air Quality
Venting Requirements
Vent Pipe Length and Diameter
Solution
Vent Pipe Material
Seal any unused openings in the vent- ing system
Vent Table
Upflow Furnaces
Downflow Furnaces
Location of Outdoor Terminations
Vent Pipe Installation
Pipe Routing and Support
Horizontal Venting
Vertical Venting
Page
Vent Termination Clearances for Direct Vent Furnaces
For appliances 100,00 Btuh 30 kW
Vertical Venting
Vent Protection
Upflow Models
= 12 Above Roof or Snow Accumulation Level
Vent Freezing Protection
Side Wall Vent Kit
Drainage of Condensate from Furnace
Concentric Vent Termination
GAS Supply and Piping
Leak Check
Manifold Pressure in WC for Natural Gas at Various Altitudes
Above Sea Level
Natural Gas High Altitude Conversion
Conversion
High Altitude Application
LP/Propane Gas Sea Level and High Altitude Conversion
Low Voltage Wiring
Electrical Wiring
Line Voltage Wiring
Verifying and Adjusting Firing Rate
START-UP and Adjustments
Start-Up Procedure
Firing rate = 1040 x 90 = 93,600 Btuh
Verifying and Adjusting Temperature Rise
Blower Speed Tap Location
Description of Components
Verifying Operation of the Supply Air Limit Switch
Verifying Burner Operation
Gas Flow Rate
Maintenance
For Upflow and Downflow Residential Furnaces
WD#
Upflow Furnace Models
Downflow Furnace Models
Sequence of Operation
Heating Mode
System Operation Information
Furnace Fails to Operate
Cooling Mode
Fan Mode
Twinning of Two Furnaces
INSTALLATION/PERFORMANCE Check List
Fuel Type
Top
Page
Image
Contents