24Chapter 3 Preparing for installation

Inspecting the interior of server

Introduction

To inspect the interior of your 600r server, you must remove the server cover.

Note: If the server is powered down, proceed with the next step. If the server if powered up, see the chapter, "Starting up and shutting down the CallPilot server", in Installation and Configuration Task List (NN44200-306) for proper shutdown procedures before you remove the server cover.

To remove the server cover

Step Action

1Attach the ESD strap to your wrist.

2While holding in the blue button at the top of the chassis, slide the top cover back until it stops.

3Lift the cover straight up to remove it from the platform.

4Ensure the CallPilot PCI riser card is secure.

5Inspect the interior for any cables that are not seated properly.

6Take note of any physical signs of damage. For example, check for loose piece parts and screws in the corners of the chassis.

7If you notice damage to any of the parts in your server, contact your Nortel representative immediately.

—End—

To replace the server cover

When you finish inspecting the interior of your server, replace the server cover.

Step Action

1Attach the ESD strap to your wrist and attach the other end to a known grounded connection.

2Place the cover on the server and align the cover with the chassis tab guides.

3Slide the top cover back until it stops.

—End—

Nortel CallPilot

600r Server Hardware Installation

NN44200-307 01.03 Standard

5.014 May 2008

Copyright © 2007-2008, Nortel Networks

Page 24
Image 24
Nortel Networks 600r manual Inspecting the interior of server, To remove the server cover, To replace the server cover