
40Chapter 5 Connecting the server to power
AC requirements as specified on the label of the power supply cover. To access the power supply cover, remove the server cover. For more information about how to remove the server cover, see "To remove the server cover" (page 24).
Figure 12
Rear panel
About the power supply module
After the server is powered up, the power supply module LED indicates its status.
A green LED on the power supply module indicates that the module is working properly. If the LED is not lit or red, the module has failed to power up. A problem with a power supply module is also indicated if the PWR or MJR LED light on the front of the server is red.
Rack power and grounding
To ensure a complete power and grounding installation:
•In
•In
Connecting the server to power
Before you begin
Ensure that proper power and grounding are available for all the power outlets serving the CallPilot server and its associated peripherals. Power for these devices must be wired and fused independently of all other receptacles and referenced to the same ground as the PBX system.
Nortel CallPilot
600r Server Hardware Installation
5.014 May 2008
Copyright ©