3.7 Main Power Connections
Connect the ac main power connections as shown below.
WARNING: Do not connect ac power to your meter until you have completed all input and output connections. Failure to do so may result in injury! This device must only be installed electrically by specially trained electrician with corresponding qualifications. The main power input to the unit as well as the AC input signal to be measured must agree with the wiring instruction.
The meter is factory set to the power specified by the customer at the time of ordering. The voltage is printed on the Label under Input power.
Refer to Section
To connect power to the unit, attach wires from the ~AC power cord to the orange
Figure 2Ð2 shows the location of P1 on the meter.
EARTH
NEUTRAL
LINE
GREEN WIRE ©
N
LP1
FUSE
SWITCH
Check for proper Earth grounding in the power distribution system (single phase).
1 | ORANGE |
2 | |
3 | CONNECTOR |
Screws
underneath
Figure 3-11. ~AC Connector Wiring (P1)
16