• Install the various covers in this order with the DCC or Turbo last:
(1)DC battery terminals
(2)
(3)AC Wiring Compartment
The surge protector’s DC + and DC- cables and the BATT TEMP sensor cable pass under this rubber bushing
Figure 16: After wiring, install all covers.
Figure 17: DCC or Turbo is installed last.
The system can now be powered up
•DC power lights up the surge protector’s DC ACTIVE LED
•AC OUTPUT from the FX will light up the AC OUT ACTIVE LED
•AC INPUT from a utility grid or generator will light the AC IN ACTIVE LED
•Initially, if any ERROR LED lights, check all wiring and inspect the surge protector circuit board for damage. If no damage or wiring problems are found but the ERROR light stays lit, please contact OutBack Technical Services
•Check the surge protector periodically and particularly after any suspected surge event. If an ERROR occurs, replace the board with an
17