Patton electronic 2292, 2294 Hardware installation, Power, VoIP Link, Enet, 100M, port, Activity

Models: 2292 2294

1 53
Download 53 pages 26.38 Kb
Page 31
Image 31
Power

Model 2292 & 2294 Series Getting Started Guide

3 • Hardware installation

 

 

 

 

 

 

 

 

 

 

 

 

 

in

k

 

 

 

 

 

 

 

 

 

 

L

L

 

 

 

 

 

 

 

 

 

I P

 

 

 

 

 

 

 

 

V

o

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

r

 

 

n

 

 

 

 

 

 

o w

e

R

u

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

P

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

v

i t

y

 

 

 

 

 

M

 

c

t i

 

 

 

 

 

 

 

A

 

 

 

 

 

 

0

0

 

 

 

 

 

k

1

 

 

 

 

 

 

in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Enet

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

v

i t

y

0

/ 0

 

 

 

 

 

 

M

 

c

t i

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

0

0

 

 

 

 

 

 

 

 

k

1

 

 

 

 

 

 

 

 

 

i n

 

 

 

 

 

 

 

 

 

 

L

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

Enet

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2294

SmartNode

IP

 

Over

 

 

-Line

 

Leased

Console

 

 

 

 

 

2

0

/ 3

 

/ 1

0

/

 

0

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ports

 

 

 

 

 

 

 

 

 

 

SmartNode 2294

 

 

 

 

 

 

 

Leased-Line Extender Over IP

 

PowerRun

VoIP

Link

100M Activity

Link 100M Activity

 

 

 

 

 

Link

0/0 0/1 0/2 0/3

 

 

 

 

 

 

 

 

 

 

 

Console

 

 

 

 

 

 

 

 

 

Voice

 

Power

VoIP Link

Enet 0

Enet 1

Voice

Voice

Port 0/3

Console

 

 

 

 

Run

 

 

100M

100M

Port 0/0

Port 0/2

 

port

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Voice

 

 

 

 

Enet 0

 

Enet 0

Enet 1

Enet 1

Port 0/1

 

 

 

 

 

 

 

 

 

 

Link

 

Activity

Link

Activity

 

 

 

Figure 13. SmartNode extender front panel LEDs and Console port locations (SmartNode 2294 shown)

4.Verify that the green Power LED is lit (see figure 13).

Congratulations, you have finished installing the SmartNode extender! Now go to chapter 4, “Getting started with the SmartNode” on page 32.

Installing the SmartNode extender

31

Page 31
Image 31
Patton electronic 2292, 2294 manual Hardware installation, Power, VoIP Link, Enet, 100M, port, Activity