Chapter 3

Hardware installation

 

Chapter contents

 

 

Introduction

24

Planning the installation

24

Installation checklist

25

Site log

25

Network information

26

Network diagram

26

IP related information

26

Configuration tools

26

AC Power Mains

26

Location and mounting requirements

27

Installing the IpChannel Bank

27

Unpacking the Model SN4400 series IpChannel Bank

27

IpChannel Bank chassis installation

27

Connecting cables

28

Connecting the FXS ports

28

Connecting the Ethernet ports

28

Connecting the 10/100Base-T Ethernet ports to an Ethernet switch or hub

29

Connecting a 10/100Base-T Ethernet port to an Ethernet-capable workstation

29

Connecting the EIA-561RS-232 configuration port (DCE configured)

30

Connecting power

30

Grounding the Model SN4400—AC and DC units

30

Installing the power cables—AC units

31

Installing the power cables—DC units

32

23

Page 23
Image 23
Patton electronic 4400 manual Hardware installation, Chapter contents