
SmartNode 4400 Series Getting Started Guide | 3 • Hardware installation |
|
|
Power cable retainer clip
(2 places)
Grounding stud
Figure 11. IEC-320 connector and grounding stud locations
2.Install the grounding wire between the grounding stud (see figure 11) and the grounding source.
WARNING
WARNING
Mains Voltage: Do not open the case the when the power cord is attached. Line voltages are present within the power supply when the power cords are connected. The mains outlet that is utilized to power the device shall be within 10 feet (3 meters) of the device, shall be easily accessible, and pro- tected by a circuit breaker.
The Model SN4400 is not shipped with power cables. For AC powered units, ensure that the power cable used meets all applicable standards for the coun- try in which it is to be installed, and that it is connected to a wall outlet which has earth ground.
The router power supply automatically adjusts to accept an input voltage from 100 to 240 VAC(50/60 Hz).
IMPORTANT
Installing the power cables—AC units
This section describes installing the power cables into the
1.Install the power cable into an
Installing the IpChannel Bank | 31 |