SmartNode 4900 User Manual | 3 • Hardware installation |
|
|
4.Repeat steps 1 through 3 to install the remaining DC power connection.
An approved external power supply that incorporates a discon- nect device must be used and positioned within easy reach of the operator’s position.
CAUTION
5.Connect the equipment to a
6.Verify that the green POWER LED is lit.
Hardware installation is complete. Refer to chapter 4, “Getting started with the SmartNode 4900 Series” on page 36.
Installing the IpChannel Bank | 35 |