3-4 CHAPTER 3: 3COM INSTALLATION WIZARD
Follow these steps to test the NIC:
1 Click Perform NIC Test.
While the test is running, a progress bar indicates test progress.
If a test fails, a message indicates the error type. Click the Help
button in the error message screen to obtain more information.
Chapter 5 provides additional troubleshooting help.
A message confirms that the NIC is functioning correctly.
2 Click Next.
The Network Connection Test screen appears, as shown in
Figure 3-4.
Figure 3-4 Network Connection Test Screen
Follow these steps to test the network connection:
1 Click Perform Network Connection Test to verify that the
network is functioning correctly.
While the test is running, a progress bar indicates test progress.
If a test fails, a message indicates the error type. Click the Help
button in the error message screen to obtain more information.
Chapter 5 provides additional troubleshooting help.
A message confirms that the network is functioning correctly.
2 Click Next.
For Windows NT—Go to “Configuring DynamicAccess
Software” later in this chapter.
For Windows 95—The TCP/IP Inquiry screen appears, as
shown in Figure 3-5.