97707987 Rev A 21
2Click on the Configuration tab. This allows you to configure:
Minimum battery level before shutdown - Select the
minimum UPS battery level, in percent, prior to the SNAZ
shutting down from the drop-down list
Minimum battery time before shutdown - Enter the
minimum UPS battery time remaining, in minutes, prior to
the SNAZ shutting down.
3Click to save the changes and, as appropriate, click
to start or click to stop the service.