Installation

UPS Setup

When the UPS is in use, allow a minimum of 4 inches (100 mm) for ventilation on both sides, top, and rear of the UPS (see Figure 3). When the UPS is serviced, allow 30 inches (762 mm) for removal of the UPS left panel. Maintain clearance in front of the UPS for user operations. If you have an optional Power Distribution Module (PDM), allow additional space in the rear for the PDM cord connections.

PDM Cord Connections

 

 

 

 

 

 

 

 

5.02 PDM Depth

 

 

32 Minimum Spacing

 

 

 

 

 

 

PDM

 

 

 

Around EBC

302

 

 

 

 

 

 

Clearance

UPS

EBC

EBC

 

EBC

 

for Service

 

 

 

 

 

 

 

 

 

 

 

 

 

42 Minimum Spacing

Around UPS

Figure 3. Spacing Requirements (Top View)

Floor Loading

When planning the installation, consider the UPS weight for floor loading. The strength of the installation surface must be adequate for point and distributed loadings. The weights are shown in the following table.

Standard Model Floor Loadings

Powerware 9150

Maximum

Point Loading

Distributed

 

Weight (lb)

(lb/in2)

Loading (lb/ft2)

Model 8 kVA

550

12.5

170

 

 

 

 

Model 10 kVA

550

12.5

170

 

 

 

 

Model 12.5 kVA

550

12.5

170

 

 

 

 

EBC-48

468

9.6

130

 

 

 

 

EBC-96

765

17.4

236

 

 

 

 

18

Powerware® 9150 User’s Guide : www.powerware.com