Installation

CB2

CB1

Safety

 

Wire

Figure 12. EBC Front Panel

5.Verify that the circuit breakers CB1 and CB2 are in the OFF position on each battery cabinet.

6.Remove the cover plate on the rear of the UPS cabinet (see Figure 13). Pull the battery connector out of the UPS, cut the tie-wrap, and discard the cover plate.

Pull the battery cable from the rear of the battery cabinet and plug it into the battery connector on the UPS rear panel. Rotate the EBC conduit fitting into position (90angle up).

Push the battery cable into the UPS and secure the EBC cover plate to the UPS rear panel.

Powerware® 9150 User’s Guide : www.powerware.com

31