R
Castile Pellet Insert
F. Removing Metal Floor of Factory-Built Firebox
•The fi rebrick (refractory), glass doors, screen rails, screen mesh and log grates can be removed from a
•Any smoke shelves, shields and baffl es may be removed from a
•The metal fl oor of the
The following is only one example as there are many dif- ferent models of
Starter hole
Mark area of floor to cut
Figure 11.1. Measure and mark the metal
floor for cutting. With a drill, make a starter hole in each corner.
Figure 11.2. Using a
Use 2 x 4 from insert packaging to support insert
Figure 11.3. If the fl oor is made of thin metal, we recommend using the 2 x 4 from the insert packaging to support the insert. The 2 x 4 may need to be cut to the appropriate size.
Keep sharp edge of metal floor away from power cord
Figure 11.4. Place the insert into the fac-
NOTE: Ensure that the leveling leg is posi- tioned over the 2 x 4 before leveling the insert. See page 18, for detailed instructions on how to adjust the leveling legs.
August 20, 2009 | Page 11 |