Site Requirements 2-1
Chapter 2Installation
This chapter contains mechanical and electrical installation procedures for
connecting the ARC-101 to the main power supply, as well as cabling the
ATM links and monitor (control) port.
2.1 General
The ARC-101 is delivered completely assembled for bench-top installation.
The ARC-101 may be optionally installed in a 19" rack (refer to Section 2.4).
2.2 Unpacking
Inspect the equipment container before unpacking. Note and report
evidence of damage immediately.
Place the container on a clean flat surface. Cut all straps and open, or
remove top.
Remove the unit carefully and place it securely on a clean surface.
Remove all packing material and inspect the unit for damage. Report any
damage immediately.