16-05-01 13:37 Site Requirements and Prerequisites 2-1
Chapter 2Installation and SetupThis chapter provides the following information for the ASMi-31 standalone
model:
• Site requirements and prerequisites
• Package contents
• Instructions for mechanical installation
• Instructions for electrical installation.
After installing the unit, refer to Chapter 3 to assure normal operation.
In case a problem encountered, refer to Chapter 4 for test and diagnostic
instructions.
Refer to Chapter 5 for additional information on the ASMi-31/R card
version.
2.1 Site Requirements and Prerequisites
Power AC-powered ASMi-31 units should be installed within 1.5m (5 ft) of an
easily accessible grounded AC outlet. The outlet should furnish 115 VAC or
230 VAC.
DC-powered ASMi-31 units require -48 VDC power source, which must be
adequately isolated from the mains supply.
• Allow at least 90 cm (36 in) of clearance at the front for operating and
maintenance accessibility.
• Allow at least 10 cm (4 in) clearance at the rear of the unit for signal lines
and interface cables.
Ambient
Requirements
The ambient operating temperature of ASMi-31 is 0 to 50°C (32 to 122°F)
at relative humidity of 90%, non-condensing.