LIBERTY L676-1Gas Fireplace
Congratulations
MANUFACTURED MOBILE HOME REQUIREMENTS
TABLE OF CONTENTS
SAFETY LABEL
INSTALLATION
WARRANTY
SAFETY LABEL
INSTALLATION
REQUIREMENTS
INSTALLATION
MA Code - CO Detector
5.08: Modifications to NFPA-54,Chapter
INSTALLATION
UNIT DIMENSIONS
Regency L676-1Direct Vent Gas Fireplace
INSTALLATION
GENERAL SAFETY INFORMATION
INSTALLATION CHECKLIST
INSTALLATION
INSTALLATION
INSTALLATION
Diagram
HEAT RELEASE KIT
INSTALLATION
CLEARANCES
Clearance to Combustibles from
Minimum Clearance from Top of Front Facing
INSTALLATION
INSTALLATION
MANTEL CLEARANCES
MANTEL LEG CLEARANCES
INSTALLATION
INSTALLATION
Diagram Diagram
Diagram
INSTALLATION
UNIT ASSEMBLY PRIOR TO INSTALLATION
INSTALLATION
FINISHING TEMPLATE
INSTALLATION
INSTALLATION
VENT RESTRICTOR POSITION
Vent Restrictor Plate
INSTALLATION
INSTALLATION
EXTERIOR VENT TERMINATION REQUIREMENTS
Minimum Clearance Requirements
INSTALLATION
INSTALLATION
VENTING ARRANGEMENTS
FPI Kit #
INSTALLATION
INSTALLATION
When using Rigid Vent other than
RIGID PIPE VENTING SYSTEMS
5” X 8” RIGID PIPE CROSS REFERENCE CHART
INSTALLATION
INSTALLATION
INSTALLATION
INSTALLATION
Regency L676-1Direct Vent Gas Fireplace
INSTALLATION
INSTALLATION
VENT RESTRICTOR SETTING
VENTING ARRANGEMENTS
INSTALLATION
INSTALLATION
Horizontal Venting with Two 2 90o Elbows
Horizontal Venting with Three 3 90o Elbows
INSTALLATION
INSTALLATION
VENT RESTRICTOR SETTING
Vertical Venting with Three 3 90o Elbows
INSTALLATION
INSTALLATION
VENTING ARRANGEMENTS
ALLOWABLE VERTICAL TERMINATIONS
INSTALLATION
UNIT INSTALLATION WITH HORIZONTAL TERMINATION
INSTALLATION
Diagram
INSTALLATION
UNIT INSTALLATION WITH VERTICAL TERMINATION
INSTALLATION
Diagram
INSTALLATION
UNIT INSTALLATION
INSTALLATION
ASTROCAP XL DIMENSIONS 946-623/P
INSTALLATION
PILOT ADJUSTMENT
GAS LINE INSTALLATION
TESTING
INSTALLATION
AERATION ADJUSTMENT
WIRING DIAGRAM
INSTALLATION
INSTALLATION
INSTALLATION
CONVERSION KIT #522-969FROM NG TO LP
LP Conversion Kit Contains
INSTALLATION
INSTALLATION
NOTE Once the unit has been installed
Burner Tube
INSTALLATION
BRICK PANEL INSTALLATION
INSTALLATION
Diagram Right Side Rod with Screen Removed
INSTALLATION
INSTALLATION
Burner Orifi ce Cover Plate Diagram
Diagram
INSTALLATION
LOG SET INSTALLATION
INSTALLATION
Log kit # 522-930contains the following pieces
INSTALLATION
INSTALLATION
5 Fit log A into the pins on the log tray
7 Fit log E into the pin at the center of log A
INSTALLATION
INSTALLATION
F BA C
1st Grate Post
INSTALLATION
INSTALLATION
Completed Log Set Installation
E F A B C
INSTALLATION
MESH PULL SCREEN INSTALLATION
INSTALLATION
Left Side Rod Right Side Rod
OPTIONAL ANDIRON INSTALLATION
INSTALLATION
Final Installation L900-1
Log G
OPERATING INSTRUCTIONS
MATCHING REMOTE CONTROL & RECEIVER CODE
LIGHTING PROCEDURE
SHUTDOWN PROCEDURE
OPERATING INSTRUCTIONS
NORMAL OPERATING SOUNDS OF GAS APPLIANCES
COPY OF LIGHTING PLATE INSTRUCTIONS
DO NOT REMOVE THIS INSTRUCTION PLATE
MAINTENANCE
MAINTENANCE INSTRUCTIONS
LOG REPLACEMENT
GENERAL VENT MAINTENANCE
MAINTENANCE
DC SPARK BOX BATTERY REPLACEMENT
DC SPARK BOX REPLACEMENT
MAINTENANCE
MAINTENANCE
VALVE TRAY REPLACEMENT
MAINTENANCE
Latch Location Latch
MAINTENANCE
MAINTENANCE
DC Spark Box
DC Spark Box
PARTS LIST
MAIN ASSEMBLY
PARTS LIST
Part #
PARTS LIST
PARTS LIST
PARTS LIST
BURNER & LOG ASSEMBLY
PARTS LIST
Part #
WARRANTY
The Warranty: Limited Lifetime
Conditions
Exclusions
See the inside back cover for details