MESH PULL SCREEN INSTALLATION

INSTALLATION

INSTALLATION

MESH PULL SCREEN INSTALLATION

1) Hang the right side mesh screen on the right side rod by placing the

3) Place the curved end of the right side rod thru the bracket located

rings on the mesh screen thru the rod. Repeat for left side.

on the top right of the glass frame.

Left Side Rod

Right Side Rod

2)Place the straight end of the right side rod thru the outer most bracket hole located on the middle inside top of the outer shell.

4) Place the straight end of the left side rod thru the inner most bracket hole located on the middle inside top of the outer shell.

Place the curved end of the left side rod thru the bracket located on the top left of the glass frame.

 

Inner Most Bracket Hole
Inside top view of Firebox

5) Spread the mesh evenly along the rod's to cover the glass door.

 

Ensure the mesh goes around the curved end of the rod's as well.

 

Completed Mesh Pull Screen Installation

Outer Most Bracket Hole

36

Regency® L676-1 Direct Vent Gas Fireplace

Page 36
Image 36
Regency L676-NG1, L676-1, L676-LP1 Mesh Pull Screen Installation, Left Side Rod Right Side Rod, Inner Most Bracket Hole