1st Grate Post

INSTALLATION

INSTALLATION

8)Fit the notch at the center of the underside of log B onto the 2nd grate post while resting the small notch on the left end of log B on the 1st grate post.

BC

10) Fit log F into the pin on the far right side of log A. Rest the 2 ends of log F on the landings on log C.

1st Grate Post

2nd Grate Post

F

BA

C

9)Rest the notch on the underside log C onto the 4th grate post.

F

C

4th Grate Post

34

Regency® L676-1 Direct Vent Gas Fireplace

Page 34
Image 34
Regency L676-1, L676-NG1, L676-LP1 installation manual Installation, F Ba C, 1st Grate Post, 4th Grate Post