4. Backup Operation

W-2WAY ECO-i SYSTEM Outdoor Unit Repair Procedures

4-2-2. Backup operation by setting the failed compressor not to operate

Backup operation settings for each compressor

INV compressor

AC1 compressor

Setting for backup operation

 

 

 

OK

Failed

DIP switch S010:

Turn BACK UP and AC1 ON.

 

 

 

 

 

Failed

OK

DIP switch S010:

Turn BACK UP and INV ON.

 

 

 

 

 

Failed

Failed

DIP switch S010:

Turn BACK UP, INV, and AC1 ON.

 

 

 

 

 

2

2 - 8

Page 47
Image 47
Sanyo CHDXR07263*, CHDXR09663, CHDX09663, CHDX07263 service manual Backup operation settings for each compressor