8. Preparations Before Operation

Check the following items before starting operation:

①Visually inspect the UPS to verify that there is no visible damage.

②Check that the UPS is connected to a utility power source that meets the input

specifications.

③ Check that the input switch MAIN SW is set to “OFF”.

④Check that load devices are connected correctly.

⑤ Check that none of the connections is loose.

④, ⑤Check load connections.

EXT.

BATT

MAIN SW

③Switch is “OFF”.

②, ⑤Check input power source

− 18 −