9.3 Outage Simulation Test
You should perform a test of whether the UPS operates properly during a power outage. Proper operation is as described below.
Note
Perform this test before powering the connected load devices on.
①Set the breaker on your utility power breaker panel to “Off”.
Buzzer |
|
2 beeps..., 2 beeps..., repeated |
|
LEDs |
|
Green INPUT | Blinking |
Green INV.ON/STAND BY | Lit |
Green OUTPUT | Lit |
② Set the breaker on your utility power breaker panel to “On”.
Buzzer |
|
Silent |
|
LEDs |
|
Green INPUT | Lit |
Green INV.ON/STAND BY | Lit |
Green OUTPUT | Lit |
Note
If your utility power breaker panel is too far away to access conveniently, you can also perform the test by setting MAIN SW to the “OFF” and “ON” positions.
Because the UPS continues inverter operation, there is a small amount of voltage (under 30V) at the input plug. Do not unplug the plug during operation.