CONTENTS
INTRODUCTION | P. 2 |
PRECAUTIONS FOR SAFE OPERATION | P. 3 |
COMPONENTS LIST | P. 5 |
INSTALLATION |
|
Assembling of the solenoid valve | P. 8 |
Installation of the door switch | P. 9 |
installation of the | P.10 |
Wiring | P.12 |
CONTROL PANEL | P.13 |
TRIAL OPERATION | P.14 |
Calibration | P.14 |
SPECIFICATIONS | P.15 |
PERFORMANCE | P.15 |
1
74