Sanyo MDF-C8V service manual Installation of the back-upkit

Models: MDF-C8V

1 92
Download 92 pages 3.61 Kb
Page 86
Image 86
Installation of the back-up kit

INSTALLATION

Installation of the back-up kit

1.The slit (bottom right rear side) which freezer is being fitted up with, a rear cover, a sensor cover, the rubber cap of the access port and insulation inside the access port are taken out.

2.Wiring ass’y BP is passed through the nylon clip 7N, and fixed on the back of MDF-UBK (option) with two screws A (M4 x 10 C It is tight.). At this time, a wiring ass’y BP point is shown from the lower corner access port of MDF-UBK 150 mm. (Fig. 1) (It is wired for the harness in the next step 3)

3.The cover which sticks to the connector (4P) in the rear of electrical box is removed and connected to the connector that it has wiring ass’y BP prepared on the product side, It is fixed with lead wire band on the side of the (Fig. 2) electrical box. The rear cover of freezer is fixed after the management of the wiring ass’y BP is finished. (Fig. 3)

4.At this time, four screws in the rear of the freezer are loosened.

(with the second from the top, the 4th (left and right)) And MDF-UBK is fixed with a screw.Fig. 4

5.An back-up system and an back-up system cover are removed, and hook of the top (Fig. 5) on the back of the back-up system is installed on MDF-UBK, and a bottom part is fixed with two screws A (M4 x 10 C It is tight.). Then, it gains a removed back-up system cover in the back-up system in the former street. (Fig. 6)

Nylon clip 7N

Fig. 1

Manual background Fig. 2

Fig. 3

Fig. 4

Fook

Fig. 5

Fig. 6

83

10

Page 86
Image 86
Sanyo MDF-C8V service manual Installation of the back-upkit