Sega 999-1108 Installation, Machine, Periodic, Servicing Memory Test, Control, System

Models: 999-1108

1 118
Download 118 pages 52.74 Kb
Page 33
Image 33

TABLE 8 EXPLANATION OF TEST MODE

ITEMS

 

DESCRIPTION

REFERENCE

 

SECTIONS

 

 

 

INSTALLATION

When the machine is installed, perform the following:

 

OF MACHINE

1.

Check to see that each setting is as per standard setting made at

8-2 F,G, 8-3 F

 

 

the time of shipment.

 

 

2.

In the INPUT TEST mode, check such input devices as each

8-2 C, 8-3 B

 

 

SW, V.R., etc.

 

 

3.

In the OUTPUT TEST mode, check such output devices as

8-3 C

 

 

lamps, motors, etc.

 

 

4.

In the SELF-TEST mode, check ICs on the IC Board.

8-2 B,J

 

 

 

MEMORY

Choose MEMORY TEST in the MENU mode to allow the

8-2 B,J

 

MEMORY test to be performed. In this test, PROGRAM RAMs,

 

 

ROMs, and ICs on the IC Board are checked.

 

 

 

 

PERIODIC

Periodically perform the following:

 

SERVICING

1. MEMORY TEST

8-2 B,J

 

2.

Ascertain each setting.

8-2 F,G, 8-3 F

 

3.

In the INPUT TEST mode, test the CONTROL device

8-2 C, 8-3 B

 

4.

In the OUTPUT TEST mode, check such output devices as

8-3 C

 

 

lamps, motors, etc.

 

 

 

 

 

CONTROL

1.

In the INPUT TEST mode, check such input devices as each

8-2 C, 8-3 B

SYSTEM

 

SW, V.R., etc.

 

 

2.

Adjust or replace each SW and VR.

8-3 D,E,

 

3.

If the problem can not be solved yet, check the CONTROL's

9,10,11

 

 

moves.

 

 

 

 

MONITOR

In the MONITOR ADJUSTMENT mode,

8-2 E

 

check to see if the adjustment is appropriately made.

 

 

 

 

IC BOARD

1. MEMORY TEST

8-2 B,J

 

2.

In the SOUND TEST mode, check the sound related ROMs.

8-2 D

 

 

 

DATA CHECK

Check such data as game play time and histogram to adjust the

8-2 H, 8-3 G

 

difficulty level, etc.

 

 

 

 

 

26

Page 33
Image 33
Sega 999-1108 Installation, Machine, Periodic, Servicing Memory Test, Control, System, Monitor, IC Board Memory Test