17. COMMUNICATION PLAY
For this game, up to 8 machines can be connected to allow up to 8 players to play simultaneously. In this instance, connecting the communication cable and setting for the communication play are required.
17 - 1 INSTALLATION PRECAUTIONS
STOP
IMPORTANT
Before starting to work, ensure that the Power SW is OFF. Failure to observe this can cause electric shock or short circuit.
Use care so as not to damage wirings. Damaged wiring can cause electric shock or short circuit.
Do not touch undesignated places. Touching places not designated can cause electric shock or short circuit.
This work should be performed by the Location's Maintenance Man or Serviceman. Performing work by
When linking a number of machines, be sure to supply sufficient power for the corresponding number of machines. Be sure to secure per machine current as stated in this manual. Failure to observe this can cause a fire and an electric shock accident.
Due to the length of the communication cable, the distance in between the machines is limited. However, to avoid accidents, be sure to secure space in excess of 70 cm between the machines.
To perform work safely and avoid serious accident such as the cabinet's falling down, do not perform work in places where
To perform work safely, be sure to secure the space corresponding to number of machines to be linked. Failure to observe this can cause accident.
The optic fiber cable is used for the communication linkage.
Excessive bending may damage the communication cable. Be very careful in this regard.
Since 2 or more machines are to be linked, sufficient power corresponding to the number of machines used need to be supplied. Note that as a standard, the per machine capacity should be 15A for the 100 ~ 120V area, and 7A for the 220 ~ 240V area.
77