![](/images/new-backgrounds/1264335/26433537x1.webp)
Automation and Drives - SCE
As destination directory, select the folder “S7LIBS“ in the Step7 directory.
Confirm with OK.
In the following window, click on the button “No“
<<the following objects were dearchived: Projects: None. Libraries: color mixing plant. Do you want to open them now?>>
The project library “Color mixing plant“ was copied to the library directory. Here, all required program blocks are stored.
Preface Installation Project Description Step7 Projekt HMI Station WinCC flexible Project Messages Recipes User Management
T I A Training Document | Page 19 of 129 | Module |
|
| F6 |
Issued: 02/2008 |
| Operator Control with WinCC flexible 2005 |