![](/images/new-backgrounds/1264335/264335125x1.webp)
Automation and Drives - SCE
6.4Checking for Consistency
Before you transfer the WinCC flexible project to the panel, the consistency should be checked. The project is checked and generated.
Click on Consistency check of the project.
The result is displayed in the output window.
6.5Transfer Settings and Data Transfer under WinCC flexible
In WinCC flexible, the settings have to be made for the transfer. Click on the button Settings for the Transfer.
For Mode, select MPI/DP; enter 1 as station address. Click on Transfer.
Preface Installation Project Description Step7 Project HMI Station WinCC flexible Projekt Messages Recipes User Management
T I A Training Document | Page 63 of 129 | Module |
|
| F6 |
Issued: 02/2008 |
| Operator Control with WinCC flexible 2005 |