![](/images/new-backgrounds/1264335/26433551x1.webp)
Automation and Drives - SCE
4.5.4Tank Block FB10
Create a new network.
Drag the tank block FB10 from the library to Network 2. Right click on the inserted block.
Select “Change to multi-instance call“ Enter the name “tank1“.
Confirm with OK.
This block contains the two step control and the calculations for simulating the level. When level sensors are used, only the two step control would be necessary. Wire the block’s inputs.
Preface Installation Project Description Step7 Projekt HMI Station WinCC flexible Project Messages Recipes User Management
T I A Training Document | Page 26 of 129 | Module |
|
| F6 |
Issued: 02/2008 |
| Operator Control with WinCC flexible 2005 |