Siemens TP177B manual Automation and Drives SCE

Models: TP177B

1 129
Download 129 pages 3.2 Kb
Page 86
Image 86

Automation and Drives - SCE

8.1.5Testing the Picture “Tank1“ in Runtime Check the consistency of the project.

46% processed, 63 steps remain ....

Linker processed 'SIMATIC HMI Staton(1)’ ....

Number of power tags used: 8

Required license: WinCC flexible Sm@rtService for panel

Required license: WinCC flexible Sm@rtAccess for panel

Completed successfully: 0 error(s), 0 warning(s)

Time stamp 12.28.2005 12:50 utilized 68320 bytes of maxi

Compiling finished!

Note

If during the consistency check, lines marked blue with internal warnings occur, the entire project has to be regenerated.

In the menu “Project“, click on Generator and select Regenerate everything (alles neu generieren).

Switch the TP177B to the transfer mode.

Transfer the project.

Test the functions in the picture “Tank1“.

Note

If the container is full, the outflow valve can no longer be opened.

You first have to empty the container using the button “HAND_OUT_BEH (E1.6)“.

If you set the data collection cycle of all variables to 100ms, the operation of the buttons and the valve function are updated faster.

Preface Installation Project Description Step7 Project HMI Station WinCC flexible Project Messages Recipes User Management

T I A Training Document

Page 86 of 129

Module

 

 

F6

Issued: 02/2008

 

Operator Control with WinCC flexible 2005

Page 86
Image 86
Siemens TP177B manual Automation and Drives SCE