Sterling 238, 882, 0 manual Starting the Loader, Changing the Conveying Sequence

Models: 238 0 882

1 43
Download 43 pages 18.2 Kb
Page 29
Image 29
5-3 Starting the Loader

5-3 Starting the Loader

1.Insert the pickup probe into the material supply.

2.Turn on compressed air to the unit.

3.Plug in power to the control enclosure.

4.Move the power switch on the Series One graphic panel to the ON position.

5-4 Changing the Conveying Sequence

DANGER! DISCONNECT POWER BEFORE OPENING THE CONTROL BOX.

Electric current, CAPABLE OF CAUSING INJURY OR DEATH, MAY BE PRESENT in the controller enclosure during these procedures.

The adjustments listed in this section must be performed ONLY by a qualified, safety-conscious technician.

The Series One controller is a time-fill mode controller, and has sixteen (16) loading sequences to select. Make sure you avoid over-filling the receiver! Figure 2 lists loading times and number of blowback pulses in each sequence. Use the chart as your model; select a sequence that suits your needs.

Powder Hopper Loaders

Page 29

Page 29
Image 29
Sterling 238, 882, 0 manual Starting the Loader, Changing the Conveying Sequence