Sterling BP1018, BP1012 installation manual Start-UpChecks, 4-4-1Checking the Cutting Chamber

Models: BP1012 BP1018

1 53
Download 53 pages 44.94 Kb
Page 26
Image 26
4-4 Start-Up Checks

1.Open the back cover, and insert the power cable from underneath the granulator.

2.Pass the power cable through the appropriate hole, and insert it into the control panel through a connector placed at the base.

3.Connect the three phase wires to the appropriate terminals of the main switch, and connect the ground wire to the terminal provided near the main disconnect switch. (See Figure 10.)

Figure 10: Electrical Connections

Phase Wire

Terminals

4-4 Start-Up Checks

4-4-1 Checking the Cutting Chamber

Before starting the granulator, open the cutting chamber to ensure that during transportation or installation, no foreign objects have fallen in. The use of heavy gloves is recommended to avoid injury when exposed to the knives in the cutting chamber.

NOTE: This operation must be carried out by an operator / mechanical maintenance engineer.

Check that the cutting chamber is free from foreign objects as follows:

1.Turn off and lockout the machine power to the granulator or remove the fuses from the main control panel.

2.Open the front panel, and remove the bin.

3.Unscrew the screw knob(s), and carefully lower the screen. (See Figure 11.)

Page 26 of 53

Page 26
Image 26
Sterling BP1018, BP1012 installation manual Start-UpChecks, 4-4-1Checking the Cutting Chamber