Setting Up Stations

Before starting the system, you must define several settings for each station, such as which pump conveys material to it. This section first discusses how to use the controller’s menu system to configure stations. The table on pages 40–41 discusses the individual choices.

Setting Up a Single Station

1.Go to the “Station Status” screen if needed. To reach this screen from any other screen, touch Menu on the right hand side of the screen, and then touch Stations. The “Station Status” screen appears.

Figure 6: “Station Status” Screen

Stations

19-20

2.On the “Station Status” screen (Figure 6), touch the icon for the station you want to setup, and hold it for several seconds. The “Station Operator” screen opens.

Figure 7: “Station Operator” Screen Before Setup

3.On the “Station Operator” screen (Figure 7), touch the Station Setup button. The “Station Setup” screen opens.

Hopper Loaders with/without Sight Glasses

18

Page 23
Image 23
Sterling Plumbing scc2 specifications Setting Up Stations, Setting Up a Single Station