Starting and Stopping the System

WARNING! In an emergency, you can use the power switch at the controller cabinet if a password is required to stop the system and you do not know the password.

Note: Normally, all the stations and pumps you want to use should be enabled before you start the system. When the system is stopped, icons for enabled stations are blue and icons for enabled pumps are yellow. Enabling stations and pumps is described on p. 303.

A button to start and stop the system is located in the lower right of the “Station Status” and “Pump Status” screens. When the system is off, the button is red and reads Push to Start System. When the system is on, the button is green and reads Push to Stop System.

Depending on the setup at your facility, the system may prompt for a password when you touch this button.

Note: If conveying does not begin when you start the system, check to make sure that all needed pumps are enabled. If they are, check that all needed stations are enabled.

Reviewing and Adjusting Basic Station Settings

The 2-pump, 20-station controller has a “Station Operator” screen for each station, as shown below. This screen enables you to review and adjust all basic settings for the station.

To reach the “Station Operator” screen, complete the following steps:

1.Go to the “Station Status” screen, if needed. To reach this screen from any other screen, touch Menu, and then touch Stations.

2.Touch and hold the icon for the station, until the controller either prompts for the password or displays the “Station Operator” screen. Once you have entered the password (if needed), the “Station Operator” screen appears.

Figure 16: “Station Operator” Screen

Settings in the box labeled Convey, the red Priority Convey Activate button, and the menu controls on the right-hand side of the screen appear for all stations. Buttons in light gray are settings that you can adjust at this screen. Boxes in dark gray are for display only. If a pump assignment needs to be changed, this must be done at the “Station Setup” screen.

2–Pump 20-Station Controllers

Operation

31 of 51

Page 36
Image 36
Sterling Plumbing scc2 specifications Starting and Stopping the System, Reviewing and Adjusting Basic Station Settings