Figure 18: “Transfer To Standby Pump” Screen

6.Touch Source Pump. The keypad pops up.

7.Enter the number of the failed pump. Use (Backspace Key) to erase any

mistakes. Use (Enter Key) to enter the value. The number appears under Source Pump.

8.Touch Standby Pump. The keypad pops up.

9.Enter the number of the standby pump. Use (Backspace Key) to erase any

mistakes. Use (Enter Key) to enter the value. The number appears under

Standby Pump, and a button labeled Transfer to Standby Pump appears on the screen.

Figure 19: Transfer To Standby Pump Button

Note: When you enter the second pump number, the controller checks to make sure that both pumps are offline and that the standby pump has no stations assigned to it.

2–Pump 20-Station Controllers

Operation

35 of 51

Page 40
Image 40
Sterling Plumbing scc2 specifications Transfer To Standby Pump Screen