5.On 115 VAC control voltage systems, run a common hot (115 VAC) wire and a common neutral wire from the controller to each pump package in the system.

On 24 VDC control voltage systems, run a common +24 VDC wire and a common 0 (zero) VDC wire from the controller to each pump package in the system.

Note: Reference “Mechanical Components Operation and Installation manual” for more details on component locations (manual part # A0536580).

3-5 Set-up

This section provides the procedures for configuring your 2-pump, 20- station controller.

Configuration of your controller includes setting the number of stations and pumps, setting variables such as convey time and blow-back interval, and setting up passwords. We recommend that you carry out these procedures in the order given here.

Note: Before carrying out these procedures, install all equipment as described in this section and in the Mechanical Components manual.

Setting the Number of Stations and the Number of Pumps

Figure 2: Default “Station Status” Screen Before Setup

1.At the “Station Status” screen (Figure 2) or at the “Pump Status” screen, touch the Menu button. The “Menu” screen opens.

Hopper Loaders with/without Sight Glasses

14

Page 19
Image 19
Sterling Plumbing scc2 specifications Set-up, Setting the Number of Stations and the Number of Pumps