Sub-Zero ICB700TR, ICB700TFI A N T I - T I P Blocking Bracket, Install Concrete Wedge Anchors

Models: ICB700TR ICB700TCI ICB700TFI

1 104
Download 104 pages 47.94 Kb
Page 14
Image 14
A N T I - T I P BLOCKING BRACKET

I N T E G R AT E D INSTALLATION INSTRUCTIONS

ACCESSORIES

Optional acces- sories are available through your Sub-Zero dealer. To obtain local dealer information, visit our website, subzero.com.

A N T I - T I P BLOCKING BRACKET

INSTALL CONCRETE WEDGE ANCHORS

1)Drill a 10 mm diameter hole any depth exceeding the minimum embedment. Clean the hole or continue drilling additional depth to accommodate drill fines. Use a carbide drill bit.

2)Assemble the washer and nut flush with the end of anchor to protect threads. Drive the anchor through the material to be fastened until the washer is flush with the surface material.

3)Expand the anchor by tightening the nut 3–5 turns past hand-tight position or to 25 foot-pounds (34N) of torque.

Always wear safety glasses and use other necessary protective devices or apparel when installing or working with anchors.

Anchors are not recommended for use in lightweight masonry material such as block or brick, or for use in new concrete which has not had sufficient time to cure. The use of core drills is not recommended to drill holes for the anchors.

P O S I T I O N THE UNIT

Before moving the Integrated unit into position, secure the door closed and remove the drawers.

IMPORTANT NOTE: On base units, the top drawer has a control cable that needs to be disconnected before removing this drawer.

Refer to illustration 3 below for placement and how to disconnect this fitting.

The drawers should be placed aside until you are ready for installation of the panels. Remove the decorative top and side molding pieces and the kickplate/grille.

IMPORTANT NOTE: If two Integrated units are installed closer than 51 mm to one another, it is necessary to use the Sub-Zero dual installa- tion heater kit (ICBTTDUAL). Refer to Dual Installations on page 21 for additional informa- tion. The heater plate from this kit must be attached to the left side exterior of the right hand unit before the units are slid into position.

Illus. 3

14

Page 14
Image 14
Sub-Zero ICB700TR, ICB700TFI A N T I - T I P Blocking Bracket, Install Concrete Wedge Anchors, P O S I T I O N The Unit