SUPERSERVER 6015W-UR/6015W-U/6015W-NTR/6015W-NT User's Manual

Installing the Server into the Rack

You should now have rails attached to both the chassis and the rack unit. The next step is to install the server into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). See Figure 2-3.

When the server has been pushed completely into the rack, you should hear the locking tabs "click".

Figure 2-3. Installing the Server into a Rack

2-6

Page 20
Image 20
SUPER MICRO Computer 6015W-UR, 6015W-NTR user manual Installing the Server into the Rack, Installing the Server into a Rack