Tools & Equipment —

No special tools required for installation.

INSPECTION

Telect is not liable for shipping damage.

Keep the container until you have checked equipment operation. If you experience any kind of problem, call Telect’s Customer Service Department. Use the original, undamaged container if you are instructed to return a panel to Telect.

If a shipping container is damaged, keep it for the carrier’s inspection. Notify the carrier and call Telect’s Customer Service Depart-

ment at 1-800-551-4567 or 1-509-926-6000

INSTALLATION PROCEDURE

Please read these instructions carefully before beginning installation. If you need assistance call Technical Support at 888-821-4856 (domestic calls), or 509-921-6161 (Option 2), or eMAIL us at getinfo@telect.com

1.Inspect equipment after unpacking and compare it to the packing list.

Immediately report any shipping damage, defects, or missing parts to Telect at 1-800-551-4567. Keep all documentation that comes with your shipment.

2.Remove lifting rings at top of cabinet and then resecure as shown on the right.

3.Before moving cabinet, make sure the pad, grating, vault, or other support is ready: namely,

If installation includes a vault, make sure vault-to-cabinet adapter is in place.

Re-Orient Rings to Lift Cabinet

Lifting Ring Orientation

(As Shipped)

If using Telect’s seismic anchor kit (Model MDC-CBAK), install anchors, as fol- lows:

a.Drill an 18 mm (25/32-in.) diameter hole, 100 to 115 mm (4¼ to 4½ in.) deep, at each of the four anchor locations.

b.Clean out holes using a shop vacuum, compressed air, or blow-out bulb. Clean away debris.

c.Place round washer on rod and then thread torque nut onto the rod. The washer should touch the top of the metal sleeve.

d.Insert anchor assembly (without the square washer) into hole. Tap anchor rod down with a hammer until washer touches the concrete.

e.Pre-torque anchoring nuts to approximately 30 ft-lb (~40 N•m) using a ¾ in. (19 mm) socket or box wrench.

Do not overtighten. Over-tightening will cause the torque nut to prematurely shear off from the plastic-encased holding nut.

f.Remove torque nut and washer, leaving anchor and stud in place.

g.For exterior installation on a concrete pad, place a water-tight gasket with cutouts for conduit and anchors on top of pre-installed pad.

4.If installation includes a base (recommended), proceed as follows:

a.Place base over anchor studs, as shown in the following illustration.

Torque Nuts With Red Plastic Collar Round Washer

Square Washer

Metal Sleeve

Plastic Guide

Expansion Sleeve

Threaded Rod

Cone

Model MDC-CBAK Anchor Kit

Telect, Inc. • USA +1.509.926.6000 • Mexico +1.52.33.3836.3700

 

Poland +1.48.713.239.100 • UK +1.44.1489.889500 • www.telect.com

Page 2-3

Copyright © 2002 Telect, Inc., All Rights Reserved