Distribution
Feeder
Cable Entrance Dock
Chock Bar
Cover Plates
Preferred Locations of Feeder Cable Clamps
Top View of Cabinet's Rear Floor
4.Use the next illustration to calculate the length of cable(s) required between the splice box (vault or aerial enclosure) and the feeder adapters near the top of the cabinet’s rear compartment. Use
The illustration shows approximate lengths of exposed subunits/buffers to accommodate the 900 µm fiber between the breakout and the SC/APC connectors. Any breakout length between 15 in. and 50 in. will fit: a short breakout length would place the breakout near the top of the feeder
Feeder Adapters
(Rear Compartment View)
16 | 9 | 8 | 1 |
Subunit/Buffer Between Breakout and Connector: ~15 in. for Connector 16 to ~25 in. for Connector 1
Subunit/Buffer Between Breakout and Connector: ~40 in. for Connector 16 to ~50 in. for Connector 1
Breakout from Cable to Subunits/Buffers Near Bottom of Rear Compartment
Breakout from Cable to Subunits/Buffers Near Top of Rear Compartment
OSP Feeder Cable From Splice Enclosure (Dressed Out)