
10. At front of cabinet, secure patch module
Thumbscrew for securing Patch Module Door
11.Repeat Steps 4 through 10 for the next Patch Module and distribution cable.
12.Continue so until all scheduled Patch Modules are installed.
13.
14.Pivot the dock to the floor of the cabinet and
15.Close the rear door.
Finishing Cable Installation
Telect, Inc. • USA +1.509.926.6000 • Mexico +1.52.33.3836.3700 |
|
Poland +1.48.713.239.100 • UK +1.44.1489.889500 • www.telect.com | Page |
Copyright © 2002 Telect, Inc., All Rights Reserved |