Each of the six possible patch modules (Model
The following illustration shows a deployed cabinet along with a partially cabled rear compartment.
Rear of Patch Module
Bar for Grounding
Two Cable Entrance Clamps
Are Included With Cabinet
To Accommodate
Two Feeder Cables*
One Cable Entrance Clamp
For a Distribution Cable*
Is Included With The
Patch Module
Anchors & Conduit Are |
| |
Not Included With Cabinet. |
| |
* Cable Entrance Clamps Accommodate | Concrete Pad | |
Cable Between 3/8 in. & | ||
| ||
In Dia. Additional clamps |
| |
are available. |
|
The distribution and feeder OSP enter the cabinet at the floor of the rear compartment. The installer clamps the cable and breaks out the fiber into
The optional