
ROUTING FEEDER & DISTRIBUTION LOOSE TUBING
When completed and before moving to the next cassette pod,
1.Install completed cassette pod on the rear door.
2.Route all loose tubing as planned and use cable ties liberally to secure tubing to lances on door and in cabinet.
3.After all feeder and distribution cabling and loose tubing has been installed, spliced, and routed,
4.Pivot the dock to the floor of the cabinet and
5.Secure the chock bar and close the rear door.
Telect, Inc. • USA +1.509.926.6000 • Mexico +1.52.33.3836.3700
Poland +1.48.713.239.100 • UK +1.44.1489.889500 • www.telect.com
Copyright © 2002 Telect, Inc., All Rights Reserved | Page |