Telenetics OM-AMPS-100 manual Firgure A-1. Sliding the Module into the Card Guides

Models: OM-AMPS-100

1 70
Download 70 pages 40.74 Kb
Page 56
Image 56

Appendix A

8-Port Expansion Module Option

3.Insert the cable clip into the round hole next to the relays labeled K2 and K3 on the component side of the Module. Use this cable clip to route and arrange cables within the OMEGA unit.

4.Hold the Module vertically above the card guides, so its 8 RJ- 11 jacks are at the top and facing toward the inside of

OMEGA.

5.Insert the Module into the card guide slots and slide it down until the male connector engages fully into the female connector on the OMEGA baseboard (see Figure A-1). This installation can only be made one way. If you are not successful with your first try, turn around the Module and try again.

Firgure A-1. Sliding the Module into the Card Guides

56

OMEGA Installation, Operation, and Maintenance Manual

Page 56
Image 56
Telenetics OM-AMPS-100 manual Firgure A-1. Sliding the Module into the Card Guides