Telenetics OM-AMPS-100 manual Figure A-2. Connecting the RJ-11 Jacks

Models: OM-AMPS-100

1 70
Download 70 pages 40.74 Kb
Page 57
Image 57

Appendix A

8-Port Expansion Module Option

6.Press down the Module gently until it snaps securely into the card guide connectors (one on each card guide).

7.Insert one end of the supplied short cable into the RJ-11 jack on the lower-left side of the Module. Insert the other end into the OMEGA unit’s RJ-11 jack on the unit’s baseboard (see Figure A-2).

Figure A-2. Connecting the RJ-11 Jacks

8.Plug in all the RJ-11 cables from the external devices (see 5, “Connecting Endpoint Devices” on page 58).

9.Set the OMEGA Power Battery switch to the ON position and close the AC fuse connector. Verify that each LED above the 8 RJ-11 jacks on the Module turns green. This color indicates that the meter ports are onhook and ready for operation.

OMEGA Installation, Operation, and Maintenance Manual

57

Page 57
Image 57
Telenetics OM-AMPS-100 manual Figure A-2. Connecting the RJ-11 Jacks